How do we work?
Step by step with us
1
Receiving the service request from the requesting party.
2
Studying the scope of work and then determining the requirements.
3
Implementing the field visit to conduct a full assessment of the current status of the study site and activity.
4
Implementing the required environmental measurements and tests.
5
Preparing the environmental impact assessment study report for the activity (project).
6
Submitting the study to the National Center via the National Center platform.
7
Follow up on the study with the National Center until it is approved and then the environmental permit is issued.
Our services
Environmental Consulting and Studies
- Environmental impact assessment studies for projects
- Marine environmental studies
- Environmental impact assessment studies for industrial activities of the third category
- Biodiversity Studies
- Preparing audit studies and environmental management plans for activities in the second and first stages
- Full supervision of environmental activities of projects
Environmental impact assessment studies for projects
- Infrastructure projects
- Water desalination plants
- Sewage line extension projects and complementary trap stations
- Projects to establish and/or develop sewage treatment plants
- Projects to establish and/or develop networks to reduce surface water levels and drain rainwater in residential neighborhoods
- Electricity projects in the stages of electric power generation, transmission and distribution
Marine Environmental Studies and Consulting
- Projects on coasts and water bodies
- Marine quay development projects
- Service and tourism projects on the beaches and their extensions into the sea
- Outfalls of various types of treatment plants. Conduct a complete marine study of them
- General Marine Survey
- Modeling
- Offshore bathymetric survey and charting
- Analyzing an Eutrophication Problem
- Assessing the nutritional status of water
- Marine water and sediment quality
- Marine physics and chemical composition studies
Environmental impact assessment studies for industrial activities of the third category
- Studies on various types of waste landfills
- Studies on various industrial activities classified as (C)
Biodiversity Studies
- Biodiversity studies in the wild environment (babasa) for the purpose of protecting wildlife
- Biodiversity studies in the marine environment
- Assessing the quality of coral reefs
- Diversity and relative abundance of coral reefs
- Reef fish
- Benthic Habitat Mapping
- Benthic cover classification and coral reef evolution.
- Plankton communities
- Marine operations
- Sea Turtle Survey
- Bird watching
- Sensitive habitats (mangroves, sea grasses, seaweeds, etc.)
Preparing audit studies and environmental management plans for activities of the second and first categories
Conducting environmental audit studies for Category II projects and activities to obtain an environmental permit or renew the permit in accordance with the standards of the National Center for Environmental Compliance Control.
- Industrial sector
- Service sector
- Health sector (hospitals)
Preparing environmental management plans for first category activities
- Medical complexes
- Small workshops with various activities and names
- Small industrial activities
- اPreparing a rehabilitation plan for deteriorated and polluted sites
- Preparing closure plans for various activities
- Preparing environmental magazines
- Preparing periodic environmental reports
Full supervision of environmental activities of projects
- Continuous monitoring of the project's environmental performance
- Updating environmental records
- Periodic environmental reports